Solar · KIT-M-SOLAR
Solar kit
Panels to charge controller, done properly. Roof entry, cut PV wire, a PV on/off breaker plan, the MPPT, the fuse and the cable to your Lynx, with a diagram that shows every connection. The Lynx is not in this kit and panels are an add-on.
Roof and controller kits together. Panels are an add-on that ships direct. Prices are estimates until the shop opens.
- Cut to length, counted to the lug. No bags of 100 and no leftovers.
- Wiring plan and install guide included for exactly what is in the box.
- Ships from Arizona. Batteries and panels ship direct from our supplier.
What you get
The gear, then the set that connects it.
The Victron equipment is named below. Every cable, lug, fuse and fastener that joins it is cut, sized and counted for this kit, and arrives in labeled packs. Planned contents; reviewed before launch.
- SmartSolar MPPT100/30, 150/60 or 250/70
- Rails and mountsfor the panels
- Roof entry gland and sealantweatherproof
- MC4 leadsfor series wiring
PV cables
Cut PV wire for the run from the roof to the controller.
Battery cables
Red and black from the controller to the Lynx, fused.
Lugs and ferrules
The controller uses screw terminals, so the kit includes the right ferrules.
Plan
Panels to MPPT to Lynx schematic, with the PV voltage check for cold weather.
The plan
Follow the diagram, not a forum thread.
Every kit ships with a detailed wiring sheet: each wire labeled with size and length, each fuse rated, each terminal named, and an install order that matches. That is what keeps the phone quiet.
What you see here is the overview. The sheet in the box adds the wire schedule, fuse ratings, notes and code references.
Specifications
At a glance
- Panels (add-on)
- 2 × 200 W / 4 × 200 W / 4 × 400 W
- Wiring
- panels in series
- Controller
- SmartSolar MPPT
- PV breaker
- 2-pole DC on/off (proposed)
- Not in the kit
- panels, Lynx
Questions
Before you order
Why series?
Series wiring raises voltage and shrinks the wire. The controller limit sets how many panels you can put in series; the calculator checks it.
Do I need a PV breaker?
A DC on/off breaker between panels and controller is good practice and often required. It is shown in the plan as a proposed part.
Pairs well with
Finish the build.
Most customers add one more stage. Everything is built to the same plan.
FlagshipMedium system
Microwave or induction, days of power, charging while you drive.
Alternator charging kit
Charge the house batteries while you drive. Fuse, charger and cable run.
Monitoring kit (Cerbo GX)
Cerbo GX and the cables that join the inverter, MPPT and shunt.